Attended Freight Dock
From Frostpunk 2 Wiki and Guides
USEFUL PAGES
List of Synergy and Conflicting Events
FP2 Guides
Factions list
Attended Freight Dock | |
---|---|
Building info | |
Zeitgeist | Adaptation |
Idea Required | Freight Docks |
Attended Freight Dock Construction Costs | |
Workforce | 600 |
Heatstamps | 120 |
Attended Freight Dock Requirements | |
Workforce | 600 |
Demand | |
Output | |
Trail Capacity | +30000% |
Railway Capacity | Increased Significantly |
“Train terminal optimized to accommodate posters travelling alongside the freight and responsible for its safety, loading and unloading.”
~ Ingame description
Attended Freight Dock is one of the Buildings for the Logistics District in Frostpunk 2. It increases Trail and Railway capacity and allows to move more resources to move through. It requires Logistics District to be built.
Constructing Attended Freight Dock will move city towards Adaptation Zeitgeist.